Friday, July 14, 2017

Progress


I have been able to spend some time working on the layout each night this past week.  I have been able to finish building the lift out bride, lay all the track and install the wiring for the south end staging. The only thing I have left to do is to install the plugs to disconnect the wiring for lift out section.  I am using trailer wiring extensions I picked up at my local Tractor Supply.

I will cut the extension in half and wire them to the DCC Bus lines.
They are only $3.00 each.

I have named the south end staging yard New London as it i the next major station south of Norwich as well as base for a local that traveled to Norwich.



New London

No comments:

Post a Comment