Monday, November 18, 2024

Making lemonade out of lemons

My friend Brian J. and I were heading down to participate in an operations session at Chris Adams's Valley Local on Saturday.  Unfortunately, the session was cancelled at the last minute, so Brian and I decided to work on my layout for a bit. We were able to lay most of the track on the lift out section. On Sunday, I finished up the lift out section and have been able to plan out the track layout for Worchester yard. The yard has two arrival/departure tracks and two tub end tracks. There is a main line running between the yard and engine facility. There is also a track running behind the engine facility leading to the fright house. The photos below will show the layout much better.


Here is the lift out section after Saturday's work.

Here is the lead to the Worcester yard. 

I need to pick up one more turn out to be able
to get to all of the staging yard tracks.

The track is next to the engine house is part of the engine facility
 and used to move power around without having to use the main.
Coming towards the foreground is the main line, two A/D tracks
 and two stub end yard tracks tracks.

Starting to plan out the the north end of Worcester yard.

Another view of the yard.

I am hoping Chris is able to rescheduled the operations. I was looking forward to seeing all the changes on his layout, I have not been down in a couple of years.

No comments:

Post a Comment