Tuesday, August 27, 2019

Making Progress

I was able to frame and put up drywall for the first 8 feet of my wall.  The wall is about 23 feet long so am one third of the way.  The next few feet are a bit trickier, I have to reroute the plumbing for my sump pump, plus move all the stuff that is jammed into that section of the basement.  Once I get the walls done, I will build sectional selves that will hold the layout pus all my stuff to open up the room. I need it to be a multi-purpose room for band practices as well as layout use as both my children are musicians.
Basic 2/4 framing.

Mold resistant Dry wall.

1 comment: