Sunday, September 1, 2019
23 Feet
I have gotten 23 feet of wall insulated, framed, wired, plumbed and dry walled. Not too bad for a week while going to work and other life stuff to do. I do still need to tape and mud the wall, but I can do that after work this week. I am not sure if I can pull it off, but I hope to get a coat of paint on it before I head to Connecticut for the New Haven Railroad Historical and Technical Association Reunion at the the Essex Steam Railroad. After that is a operation session on Chris Adams' Valley Railroad. I am sure to come back energized to finish the room and get building the layout!
Labels:
Construction,
NHRHTA,
Valley Line
Subscribe to:
Post Comments (Atom)
heh - I'm getting energized just watching a new layout room start to take shape! Keep it going! :^)
ReplyDeleteI taped and put the first coat of joint compound on last night! Sanding and coat two go on tonight.
ReplyDelete