Sunday, September 1, 2019

23 Feet

I have gotten 23 feet of wall insulated, framed, wired, plumbed and dry walled.  Not too bad for a week while going to work and other life stuff to do.  I do still need to tape and mud the wall, but I can do that after work this week.  I am not sure if I can pull it off, but I hope to get a coat of paint on it before I head to Connecticut for the New Haven Railroad Historical and Technical Association Reunion at the the Essex Steam Railroad.  After that is a operation session on Chris Adams' Valley Railroad.   I am sure to come back energized to finish the room and get building the layout!

A nice section of wall.  I moved the pipe for the sump pump so is goes up
through the wall instead of in the room like it use to be positioned.

2 comments:

  1. heh - I'm getting energized just watching a new layout room start to take shape! Keep it going! :^)

    ReplyDelete
  2. I taped and put the first coat of joint compound on last night! Sanding and coat two go on tonight.

    ReplyDelete