Tuesday, January 23, 2018

Bridging the Gap

I need to pick up  new roof for my tower as the current one is missing a big chunk out of  corner.  Steve from Hobby Gallery will have one at the Springfield show, so I do not have to wait long.  In the mean time, I have constructed a Rix concrete overpass to continue the road on the upper area of Norwich If that area looks familiar, it is John Pryke's South Boston from the large layout he had in Acton MA. I built the bridge bet the instructions and the base coat of paint is Krylon Camo Khaki.  It still needs to be permanently placed and weathered.  I still have more work to do in the area, so I will wait to permanently place it.


No comments:

Post a Comment