Saturday, April 8, 2017

Conrail N8a Caboose, Part 2

I have done some more work and rework on my Conrail N8a.  I was not happy with how the bay windows looked and rebuilt them.  A not on how I work on building models.  On this project I am not aware of any drawings of the rebuilt cabooses.  I simply estimated the size and position of the bay windows and used sizes of commercially available strip styrene.  I use a set of calipers to measure distance between things and transfer that to the styrene.  I don not actually use a ruler to measure the item.

I added two strip of .040 x .100 styrene wit the ends cut a a 45 degree angle.
Note the access hatch to the lower right of the bay window, I made this by simply
gluing some narrow strips to the car body.  The latches are made the same way. 



I have added a window frame made from .010 x .100 styrene.
Here is how I made the end sections on the bay windows.  I cut the top pf them
at a 30 degree angle and then drilled two holes for the top and bottom of the
window.  I then cutout the material in the middle to create the window opening.

I have added the top of the bay window this is from a .010 x .125 strip of
styrene, the ends at a 45 degree angle.
 .
Here is the the other side.
I am know waiting for some Detail Associates rectangular vents to finish up the model.  It is a fairly easy kitbash and make a very distinctive model.

Tuesday, March 28, 2017

Conrail N8A Caboose

For a change of pace I have decide to build a caboose to go along with the RS-3m that I am building. Penn Central converted a group of New Haven RR NE-5 and NE-6 cabooses into bay window cabooses.  Both rebuilds were lumped together into the N8A class. I choose to use an Atlas NE-6 for the conversion.  They are very easy to disassemble as nothing is glued.  I had an undecorated one so it is an easy start.

Former NH NE-5 Caboose, both side windows sealed and no roof walk.


Another former NH NE-5, one window sealed.


Former NH NE-6.  The side with out the smoke jack has an access door along the
bottom of the car body side near the bay window.  It uses EMD style door latches.

Here is the smoke jack side of the caboose. Note the vents added to the sides. 
The window to the left of the door on each end is also sealed.


Here is the Atlas NE-6.  I have removed the awning over the window on the right as
well as the sill that goes around the window.  I do need to clean up the bay opening.


Here is the end with the one window sealed.

Monday, March 27, 2017

Weathering, First Attempt

First attempt may not be entirely true, but it is with using Pan Pastels.  I started on some basic boxcars and then tried a Bachmann H-16-44.  I watched Mike Confalone's weathering videos from MRH.  Take a look below and let me know what you think.  I really find weathering back locomotives difficult.




The H-16-44 ready for Dullcote.  I did add Hancock Air Horns and some
bits of styrene to represent the steam generator.

Here it is after a round of pan pastels.

Another shot.
Please feel free to comment on the box cars and locomotive.  I am very open to creative criticism, and am always looking to improve.

Saturday, March 25, 2017

Cleaning up and finishing projects

The usable space on my work bench as continually was getting smaller and smaller.  I had to clean up and I now have room to work.  I have also dug out a lot of models that I need to build or get rid of as well.  I have decided to work on trio of ALCo’, two RS-3’s and an RS-11.  The RS-11 s a rebuild of one I built when I was in collage back in the late 1980’s.  When I originally built it, I did a decent job, but I did not modify the windows fuel tank, nor add the train control box.  I also used the in correct decals, using the extra serif ones made for the GP-9’s.   I was able to new shells for the hood and cab as well as grab irons from Atlas.  This time I did make the modifications to the cab windows  and add the  the train control box.  I also modified the fuel tank.

Here is the Atlas shell with Custom Finishing steam generator added
along with the Atlas grab irons.

The fuel tank is from an Atlas RSD4/5.  I then dded bits of styrene to ends to
create the tank used by the New Haven.
Here is the unmodified cab with a line showing where i plan to
extend the window

This shows the modified cab window.  I just eye balled the open from photos.
This also shows the train control box from Details Associates.I built the
 walkway from .010 styrene.

Here is the location of the factory applied air horn that needs to be filled and
smoothed.

Here are the two RS-3 I am working on, more info in the near future.




Tuesday, March 14, 2017

Snow Day

With up to 24 inches of snow today, the whole family is home from work and school.   It is a bit chilly to work in the basement so I figure I will talk about the concepts behind my modeling.   I have always liked the New Haven Railroad; this is really a factor of having grown up in a family were my grandfather worked for them for over years and my mom worked for them for a few years.   Unfortunately my grandfather passed away shortly after I was born, but I do have many New Haven related Items that he had accumulated.
So now you know why the New Haven Railroad, why the Norwich and Worcester line.  I first looked at the Springfield line, but there is too much railroad to deal with, something like passenger train and through frights in hours.  After reading about Putnam in the NHRHTA Shorliner, I decided it would be a great option with two secondary main lines crossing over each other and running parallel for a bit.   The one problem is that the line between Boston and Hartford in the August, 1955 floods.  I like modeling the New Haven in 1958 giving me the opportunity to model both McGinnis and earlier paint schemes, and all the diesel locomotives except the U-25b’s and C-425’s that came in the mid 1960’s.  I have decided to proto freelance by having the Boston to Hartford line still in service and the East Wind passenger train still operating between New York and Portland Maine.  I also have the State of Maine routed of the N&W to increase passenger service over the line.  Based on using early 1950’s traffic, there are around 13 trains a day over the line.  Plenty to keep a few operators busy.

I have a thing for mixed consists, be it locomotive lash-ups or passenger trains.  Penn Central in the summer of 1969 gives me that look.  Stretching the proto freelancing more, there still is passenger service over the line using a mix of NH, NYC, PRR and PC equipment, the same with locomotives and cabooses.   The 1977 goes one more step with Conrail and all of its components as well as Amtrak.  I have additional plans or the later eras but will touch base on them later.  For now I am just getting the first section of the layout built.